Order a crew, not a headcount

Each package is a tested composition of roles with a lead, a quality check and a productivity target. Request one as-is or tune it to your scope.

Lead Technician Support / apprentice QA / audit

Crew packages

  • Data Center Field Services

    Rack installation crew

    9 people

    • Crew lead× 1
    • Data-center technicians× 6
    • Material coordinator× 1
    • QA technician× 1

    Receiving, positioning, leveling, mounting, power connectivity support and labeling of racks and cabinets.

    Productivity
    18–24 racks / day
    Typical duration
    4–16 weeks
  • Workforce · Projects

    Fiber-splicing crew

    6 people

    • Lead splicer× 1
    • Fiber splicers× 4
    • Test technician× 1

    Fusion splicing (single and ribbon), OTDR testing and documentation with calibrated splicers and test sets.

    Productivity
    600–900 splices / day
    Typical duration
    2–24 weeks
  • Workforce · Projects

    Fiber deployment crew

    10 people

    • Crew lead× 1
    • Fiber technicians× 8
    • QA technician× 1

    Backbone and campus fiber placement, pathway, termination and testing — the PRD’s reference crew.

    Productivity
    2,500–4,000 ft / day
    Typical duration
    4–26 weeks
  • Data Center Field Services

    Structured-cabling crew

    10 people

    • Crew lead× 1
    • Low-voltage technicians× 6
    • Apprentice× 2
    • QA technician× 1

    Copper and fiber horizontal and backbone cabling, tray, dressing, termination, certification and labeling.

    Productivity
    120–180 drops / day
    Typical duration
    3–20 weeks
  • Data Center Field Services

    Network deployment crew

    6 people

    • Field engineer× 1
    • Network technicians× 4
    • Cabling technician× 1

    Switch, router and firewall installation, patching, console verification and hand-off to remote engineering.

    Productivity
    40–60 devices / day
    Typical duration
    2–12 weeks
  • Operations & Maintenance

    Smart-hands team

    4 people

    • Lead technician× 1
    • Data-center technicians× 3

    A rotation that covers reboots, replacements, tracing, inspections and installs for a site or cluster.

    Productivity
    24/7 rotation
    Typical duration
    Ongoing
  • Operations & Maintenance

    Maintenance crew

    5 people

    • Lead technician× 1
    • Maintenance technicians× 3
    • Electrician× 1

    Preventive maintenance, inspections, cleaning, battery checks and audits generated from your PM schedules.

    Productivity
    PM schedule
    Typical duration
    Recurring
  • Projects · Operations

    Decommissioning crew

    8 people

    • Crew lead× 1
    • Data-center technicians× 5
    • Asset auditor× 1
    • Material coordinator× 1

    De-installation, asset reconciliation, serial capture, chain of custody, packing and space restoration.

    Productivity
    30–50 racks / day
    Typical duration
    2–10 weeks

Every crew includes

Managed, not just staffed

  • A Super InfraWorks lead accountable for attendance, safety and productivity
  • Verified credentials for every member before mobilization
  • Calibrated equipment from the regional pool, tracked by crew
  • Daily field reports: workers on site, quantities installed, photos, delays
  • Toolbox talks and safety observations logged every shift
  • Rapid replacement if a member rolls off — the crew keeps moving